Advertisements
Solution:
RD = 1.0
Starboard side = 0cm above by below summer draft
Port side = 50mm (5cm above the water line to summer draft)
Mean draft = (0+5 ) / 2
= 5/ 2
= 2.5cm above the water line
FWA = 180mm
= 18cm,
TPC = 24
As we know :
Change in draft =
(Change in RD )x(FWA)
0.025
= (1.025 – 1.005 ) x 18 /0 .025
= (0.2 x 18) /0 .025
= 14.4cm
Total sinkage = (14.4 + 2.5) cm
= 16.9cm
TPC is SW = 24
TPC = (A / 100) x 1.025
= (24 x100)/ 1.025
A = 23.41 t/cm
Again ,
TPC in RD 1.005 = ( A / 100) x 1.005
= (23.41 x 1.005)
= 23.53t/cm
Cargo to load = sinkage x TPC
= 23.53 x 16.9
= 397.657 t