From the following details, Calculate the DWT available :- present free board: port 3.0m, starboard 2.9m in water of RD 1.020 FWA 200mm. TPC 30. Statutory summer freeboard 2.8m.

Advertisements
Solution :

For, Port Side = (3 -2.8)  = 0.2m
= 20cm (above )

For , Starboard side =( 2.9 – 2.8) =0. 1m
= 10cm above

Hence ,Mean freeboard can be calculated as
= (20+ 10)/2
= 30 /2 cm
= 15cm available

As we know:

Change in draft = 

(Change in RD )x(FWA)
             0.025

= (1.025 – 1.020 ) x 20 /0 .025
= 4cm

Now, Total sinkage = (15 + 4)cm
= 19cm

TPC = 30( given)
TPC   =  (A/ 100) x density
30   = (A/100) x 1.025
A = 30/ 1.025
= 29.268m2

Again for calculating  ,TPC at RD 1.020
= (A/100) x ( 1.020)
=  29.85 t/cm

Now , Cargo can be load =( TPC x sinkage)
= (29.85 x 19)
= 567.15 t

Leave a Reply

Your email address will not be published. Required fields are marked *

error: Content is protected !!